Share requirements
Start with non-confidential application information, quantity and intended use.
Start with the component and the result you need. We will review whether a coating service, process development discussion or equipment enquiry is the appropriate next step.
Discuss your requirements →
APPLICATION ILLUSTRATION / THIN-FILM SURFACES
For projects that begin with a component, a drawing or a coating specification. The first review considers the substrate, geometry, coated surfaces and performance targets.
Material, dimensions, drawing, coated and masked areas, target optical or surface properties, test methods and sample quantity.
Discuss a coating application →
TESTING RESOURCE / CONTACT-ANGLE EVALUATION
For projects that need a defined technical investigation. Start with the existing process, observed problem and acceptance method, then agree an evaluation scope.
Current specification, available test curves or reports, failure description, process constraints and the outcome you want to evaluate.
Discuss a process question →
EQUIPMENT RESOURCE / OPTICAL COATING
For projects considering vacuum coating equipment. Define the coating process and production conditions before discussing a configuration or scope of supply.
Process description, component range, target capacity, site location, available utilities and acceptance requirements.
Installation, training, spare parts, service coverage and acceptance terms are confirmed for the individual project.
Discuss an equipment project →You do not need to select a final solution before contacting us. A component description and an initial specification are enough to begin the discussion.
| Your starting point | Suggested route | Useful initial information |
|---|---|---|
| A part needs a coating | Coating services | Substrate, drawing, coated area and test requirements |
| A defined coating problem needs investigation | Process development | Current process, test results and acceptance criteria |
| A production line needs coating equipment | Equipment enquiries | Process, component range, capacity and site conditions |
Every coating application is reviewed individually. We assess the substrate, component geometry, performance targets, quantity and intended use before proposing a tailored technical and commercial plan. Sample scope, testing, pricing, order quantity and delivery schedule are agreed for the specific project.
Start with non-confidential application information, quantity and intended use.
Review substrate, process limits and the proposed performance targets.
Agree samples, tests, timing, responsibilities and commercial terms.
Use the evaluation results to discuss further development or production.
No. Describe the part, material and intended use. Include the requirements you know and identify the points that still need review.
Begin with non-confidential information and discuss confidentiality arrangements before sending sensitive project documents.
Sample scope, test requirements, material, quantity, timing and commercial terms need to be reviewed for the individual project.
Agree the test method, conditions and acceptance criteria before evaluation. Performance depends on the specific substrate and coating structure.
Component. Substrate. Coating objective. Test requirements.